Renovation Update - Week 1 & 2

Updated Thursday, April 7, 2011  ::  Views (6625)

Demo is complete, moving on...

We have now replaced all the baseboard and trim in the house, installed some new doors, trimmed out a pillar on the main floor and installed panel molding on the box in the kids bedroom (not sure how else to describe the “box”).

After the trim work was completed we started installing the kitchen, built an island, tiled the bathroom floor and tub, painted the entire house, replaced all door handles and most light fixtures so far, replaced all the vent covers and receptacles, installed a new toilet and vanity in the upper bathroom and pedestal sink in the lower level bathroom. 
Next step we will be installing all new flooring, finishing the kitchen, creating a major storage space in the back-room/laundry room area and garage, then some landscaping.
Our goal is to keep renovation costs under $15,000 and complete the project in a month and a half.   So far we are on target! 
If you have any questions about how to shop for a reno on a budget, call me :)
Trisha Bowman
Century 21 B.J. Roth
705-796-4150
Pillar on main floor
Pillar and painted railing
Box in kid's bedroom
Kid's room painted, trimmed and waiting for carpet
Trim work above all windows and doors
Closet doors installed
Building the island
Kitchen
Lower level bathroom
Upper Level Bathroom
Master bedroom painted
Office painted
Family room painted and Trimmed

Add a Comment

Fields marked with "*" are required to process your form.
Your Name
*
Email Address (will never be shown)
*
Website
Comment

Allowed XHTML tags : a, b, i, strong, code, acrynom, blockquote, abbr. Linebreaks will be converted Automatically.

CAPTCHA Image